Tags / ,
 
Project Name / Aegean Dream Turgutreis
Client / ANB Turizm
Location / Bodrum,Turkey
Project Type / Hospitality
Project Role / Architecture, Interior Design, Project Management
Year / 2004
 

We were retained as Design Architect, and Project Manager to Aegeag Dream, Turgutreis, Bodrum Turkey. We have succesfully finalized the interior design of this resort hotel within 6 months from inception, and project managed the fit-out and construction works. We have assisted the Owner to hire 60 sub contractors (including Indonesian wood works sub contractors ) and administred with a team of 3 Architects, 2 Engineers, and 1 Project manager more than 120 contracts. Our interior design was finalized 6 months from assignement, and the construction 8 months from commencement of construction, a record in Bodrum.

[ngg_images source=”galleries” container_ids=”2″ display_type=”photocrati-nextgen_basic_thumbnails” override_thumbnail_settings=”0″ thumbnail_width=”240″ thumbnail_height=”160″ thumbnail_crop=”1″ images_per_page=”20″ number_of_columns=”0″ ajax_pagination=”0″ show_all_in_lightbox=”0″ use_imagebrowser_effect=”0″ show_slideshow_link=”1″ slideshow_link_text=”[Show slideshow]” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]